Custom Engineering

When nothing standard fits

Engineered-to-order machines: designed against a specific duty, a specific interface or a legacy envelope that has to be held exactly. There is no minimum quantity — one machine is a normal order.

Minimum quantity
1
Typical lead time
14 – 26 weeks
Voltage
up to 10 500 V
Design approval
Before manufacture
Scope

What gets built here

Replacement machines for units whose original manufacturer no longer supports them, built to the existing foundation bolt pattern, shaft height and coupling so no civil or alignment work is needed.

Machines for a duty that no standard product survives — high inertia, frequent reversal, non-sinusoidal supply, ambient temperatures well outside the design assumption, or a duty cycle with hundreds of starts per day.

Machines that do not exist as a standard product at all: inductor machines, special-frequency units, and drives for test benches and laboratory rigs.

In every case the work starts from constraints rather than from a product family. The first question is not which machine, but what the machine has to fit and survive.

Process

Six stages, with the approval gate in the right place

Design approval sits before manufacture, not after. That is the difference between a change that costs a week and one that costs a machine.

01You supply

Requirement and survey

What the machine has to do, where it sits, and what it has to fit. For replacement work this is a dimensional survey; for new duty it is the load and duty cycle.

02Electromash

Feasibility and concept

Whether the requirement can be met inside the constraints, and at what cost. If it cannot, you find out here rather than after an order is placed.

03Electromash

Technical proposal

Electrical and mechanical design, outline drawing, performance data and the test programme, issued for your review.

04You approve

Design approval

Your engineers approve the outline and the interface dimensions before manufacture begins. Changes after this point cost time.

05Electromash

Manufacture and test

Production, followed by routine tests and any type or witness tests agreed in the proposal.

06Joint

Delivery and commissioning

Documentation pack, delivery, and site attendance for installation and first run where required.