Skip to content
ELECTROMASHElectrical machines since 1959
Manufacturing

Manufacturing and testing

Design, machining, winding, assembly and testing under one roof. For an engineer evaluating a supplier, the test bay is the part that matters — a machine that has not been tested against the standard it claims is a machine with a nameplate and a hope.

Capability

What the works does

Written to what a technical auditor would ask about, not to a list of adjectives.

Winding and insulation

  • Automatic and manual stator winding to frame 710
  • Vacuum-pressure impregnation for Class F and H systems
  • Form-wound coils for medium- and high-voltage machines
  • Insulation resistance and polarisation index testing on every unit

Machining and fabrication

  • CNC machining of frames, end shields and shafts
  • Flame-path machining to certified tolerances for Ex enclosures
  • Rotor bar fabrication and cage brazing
  • Dynamic balancing to ISO 21940 grade G2.5

Assembly

  • Dedicated assembly bays for standard and engineered machines
  • Single-unit production runs alongside series work
  • Bearing fitting under controlled conditions
  • Certified nameplate marking and documentation pack assembly

Test bay

  • Routine tests to IEC 60034-1 on every machine
  • Type tests including temperature rise and efficiency to IEC 60034-2-1
  • High-voltage and impulse testing
  • Customer and third-party witness attendance
Imagery

This is where factory photography goes

Authentic photography of the works — the winding shop, the test bay, a machine on the balancing rig — is the single strongest visual differentiator available to a manufacturer's website, and the one thing a competitor cannot copy.

A dependency, not a nice-to-have
Whether a production team can get into the works — permits, photography restrictions in the halls, visas, scheduling — has to be established early. If access is not possible, the alternative is existing photography plus 3D rendering, which is a different budget and a different result. Either way the decision cannot wait until the design phase.