Generator refurbishment, 2.4 MW run-of-river plant

Two vertical hydro generators replaced inside a powerhouse built in 1968, to the original civil works.

Units
2
Rating
1 200 kVA each
Head
11 m
Civil work
None
The problem

The original drawings were incomplete and the plant had been modified twice. Runaway speed had to be re-established from the current turbine configuration rather than from the historic documentation.

What was done

A survey of the existing machines and turbine set established the actual geometry and runaway condition. New generators were designed to the surveyed dimensions, with a combined thrust and guide bearing rated for the measured runaway speed.

Outcome

Both units were installed without modification to the powerhouse. Annual generation increased by an estimated 6 % from improved efficiency at part load, where the plant spends most of its year.